Covington’s Rivercenter Boulevard is set to be closed for the next month due to ongoing construction at the former IRS processing center site.
West Rivercenter Boulevard will be closed to through traffic just west of the Northern Kentucky Convention Center starting Wednesday, May 29, until approximately July 1. Pedestrian access will also be affected to a partial extent.
Bray Construction Services will set up detour signs and an electronic message board to help drivers get around the area.
Currently, Bray Construction is in the midst of installing streets, sidewalks, utilities, and other public infrastructure on the 23-acre site of where Covington is building the new Covington Central Riverfront mixed-use neighborhood. The street closure is related to the installation of underground water main, separated sewer and stormwater lines on the site.
The timing of the street’s reopening is tied to the weather and its impact on-site work.
In addition:
- The two public parking lots butted up against the floodwall on the north side of West Rivercenter Boulevard just west of Madison Place will remain open throughout this time. These are the 27-space “Floodwall Lot” and the 38-space “West Lot.”
- The sidewalk on the south side of the street will be closed during the sewer tie-in and pedestrian traffic temporarily re-routed. The asphalt path on the north side attached to the parking lots will remain open all but for a limited time.

